67 meter long timber railing. Architect designed. Sawn, planed, assembled and
painted in place.

August 2016

Insurance Issue. Water damage. Dormer windows.. Removing interior walls including
insulation and wood. Installation of three new composite window. Installation
of new insulation, new drywall, plastering, painting. On the outside: dismantling of the
roof tiles. New panel including new battens and new roof paper.

August 2016

 

Råå. 70 square meter extension of the villa. Raising of the stud frame. Installation of rafters.
Installation of insulation in walls and ceilings. Installation of outer plaster board.
Installation of inner plasterboard.Installation of plumbing. Masonry of brick facade.
Installation of windows, sheet metal, roofing paper, battens, roof tiles and gutters and
downspouts.

Middle of March - beginning of June 2016

 



Omskapa en äldre fastighet till en nyare.
Familjen Chadinha. Benarpsvägen 445. Mörarp

Långarödsvägen, Höganäs. 350 kvm. Skalbygge.

Grundläggning. Lund. Tillbyggnad.

 

Mariastaden, Helsingborg.
Pergola, kompositdäck, skjutdörrar med öppning av fasad

Nygårdavägen Höganäs
2 hus och 2 garage. Från platta på mark till nyckelfärdigt.

Västra Parkgatan, Höganäs
2 1/2-plans villa. 450 kvm. Från platta på mark till nyckelfärdigt.

 

 Nu är takstolarna på plats, och taket har börjat isoleras och läggas.

 

Mellanbjälklag inkl. golvvärme till plan två klart. Dags att förbereda för montering av takstolar.

Nybyggnation av nyckelfärdigt hus, 450 kvm, Brors Backe, Höganäs.

Byggnation av större villa, Långarödsvägen, Höganäs.

Takrenovering inkl byte av merparten av råspont, läktning, pappning, takpannor och plåtar.